Following a presentation to the client (Arun District Council) on the benefits of high-quality tree planting specification and how this results in cost-savings in the long term, the design received approval.
The design consisted of seven 3.0m x 1.5m tree pits. StrataCells were installed two layers deep with root protection provided by the GreenBlue Urban Modular RootDirector. The surface finish was completed using the heavy duty 1500mm x 1500mm Castle Recessed Double Tray Tree Grilles.